15.44.010 License fees.

Section 1.

Fees required to be paid pursuant to this Title 15 Building and Construction, in connection with any license, registration, examination, license application, plan review, building permit, plumbing permit, mechanical permit, electrical permit, inspection or reinspection, or otherwise required to be paid pursuant to said Title or any code adopted therein by reference, shall be determined and paid in accordance with the following schedule, and are subject to the additional conditions, if any, specified herein:

A. Annual Contractor License (or Registration Fees):
 License Fee
 1. Building “A” Contractor License $310.00
 2. Building “B” Contractor License  $260.00
 3. Building “C” Contractor License  $220.00
 4. Building “D” Contractor -- Single Trade License   $130.00
 5. Building “D” Contractor -- Wrecking License  $260.00
 6. Building “D” Contractor-- Moving License  $220.00
 7. Plumbing Processing Fee For Registration   $130.00
 8. Plumbing Utility Contractor (Sewer & Water Service Lines or Fire Mains)   $130.00 each
 9. Water Connected Appliance  $130.00
10 Mechanical “A” Contractor  $260.00
11 Mechanical “C” Contractor (Gas Fitter or Sheet Metal or Refrigeration) $130.00 each
12 Electrical Registration No Fee               
B. Annual Craftsmen License/Registration Fees:
 License Fee
1 Mechanical Master License $130.00
2 Stationary Engineer Registration  $130.00
3 Journeyman Gas Fitter Registration or License  $40.00
4 Journeyman Sheet Metal Worker License  $40.00
5 Journeyman Refrigeration License  $40.00
6 Mechanical Apprentice Registration  $40.00
C. Examination Fees:
 Examination Fee
1 Building “A” & “B” Contractor $100.00
2 Building “C” Contractor $70.00
3 Building ‘D” (Per Exam)  $50.00
4 Mechanical Contractor (Per Exam)  $50.00

D.         Renewal License and Registration Fees:

            1.         All licenses and registrations shall become delinquent on December31 of the year issued and shall be renewed annually upon application and payment of the required license or registration fee; subject, however, to the following limitations: the fee for any license or registration renewed after January 31 but on or before March 31 shall be one and one-half times the annual fee for such license; the fee for any license or registration renewed after March 31 but on or before May 31 shall be twice the annual license or registration fee for such license or registration. All required insurance coverage certificates shall be filed and approved before a license or registration is renewed. Any license or registration not renewed before May 31 of the year following its issuance shall thereupon expire and may not be renewed without examination, if examination was required upon issuance of the initial license.

          2.         No permit shall be issued to any unlicensed or non-registered person engaged in the construction business, or to any licensed or registered person who is delinquent in payment of his or her annual license or registration fee, or who has failed to comply with a provisional order, or whose license or registration is suspended or revoked, or who is in any manner indebted to the Department, or whose insurance has then expired.

E.         License Application Fees:

            1.         An application fee of $35.00 is required to be paid at the time the license application is submitted to the Pueblo Regional Building Department for review and acceptance. Upon review of the application, the applicant will be notified that either (a) the application cannot be accepted together with a statement of the reasons it cannot be accepted or, if additional information is required, identification of the necessary additional information, or (b) that the application has been accepted and the date or dates upon which examination for the license will be held.

F.       Plan Review Fees:

Plan review fees shall be charged as follows:
Plan to be Reviewed Fee
1. New one and two family dwellings 10% of the building permit fee
2. All other building and additions and alterations to existing buildings 50% of the building permit fee
3. Additional plan review required by changes, additions or revisions to approved plan $30.00 per hour

Review of plans by the Department is merely a code compliance review and not a structural or suitability review. Such review shall not relieve the designer, architect, engineer or contractor of responsibility for the structural integrity of the contemplated work or from compliance with all provision of all applicable codes.

All ground mount commercial solar projects are exempt from the above Plan Review Fees schedule.

G.         Building Permit Fees:

  1. General

           a.         Permits are issued only for work that is described or shown on approved plans or specifications.

           b.         Permits may not be issued until all required approvals have been received from other governing agencies.

           c.         Permit fees for all construction projects are based on total contract value, including but not limited to all building structure work, electrical, mechanical, and plumbing systems, and sprinkler work, finish work, overhead, material, labor and profit.  Subcontractors will be required to obtain a no-fee permit for their portion of the work.

         d.         If a contractor or subcontractor is changed from that indicated in the initial list provided before beginning the job, the Building Department shall be notified. If during the course of the job a contractor or subcontractor in which a permit has been issued to is changed, the new contractor or subcontractor will be required to obtain a minimum fee permit of $60.00

        e.         The Department may require the Contractor to file with the Department copies of its contracts with the owner of the work, and with any one or more subcontractors employed in the work.

        f.          A minimum fee of $30.00 shall be charged for all permits. If a permit is cancelled before any work is done, fees will be refunded except for an administrative service charge of $15.00

    2.   Residential

           a.         Permit fees for alterations and remodeling shall be based on the contract value. Permit fees are derived from Table B below.

           b.         The permit fees for all new construction and for additions to existing structures shall be calculated based upon the Total Valuation of the work in accordance with Table B below. The Total Valuation of the work shall be the aggregate of the value of all classifications of improvements based upon the square footage of the improvements and calculated in accordance with Table A below.

      3.  Manufactured Structures

          a.        Permit fees for all manufactured structures shall be calculated based upon the total valuation of the work in accordance with Table C.  The total valuation of the work shall be the aggregate of the valuation of all classification of improvement based upon the square footage of the improvements and calculated in accordance with Table B.

           b.         Certificates of Occupancy for manufactured structures may be obtained from the State of Colorado Division of Housing.

      4.   Commercial Structures:

            Permit fees shall be calculated based upon total contract valuation in accordance with Table B.

      5.  Sign, Moving and Wrecking permits:

            Permit fees shall be calculated based upon total contract valuation in accordance with Table B.

TABLE A

I. New Residences and Additions Thereto:
Residence Fee Per
a.   All Finished Living area $73.93 Per square foot
b.   Basement, unfinished 12.50 Per square foot
c.   Finish existing basement 19.50 Per square foot
d.   Finished garden level or basement level 32.00 Per square foot
II. Manufactured/Modular Residence:
Residence Fee Per
a.   Sitting of Manufactured Home $45.00 Per square foot
b.   Finished Basement 32.00 Per square foot
c.  Unfinished Basement 12.50 Per square foot
III. Garage and Accessory Structures:
Structure Fee Per
a.   Detached garage $24.00 Per square foot
b.   Attached garage  22.00 Per square foot
c.   Carports - open on two or more sides 15.00 Per square foot
d.   Open patios or porches with roof 11.00 Per square foot
e.  Enclosed patio 25.00 Per square foot
f.   Deck 10.00 Per square foot
g.   Deck with roof 20.00 Per square foot

All permits valuations shall be adjusted annually by a modifier of 5% for 2015 and 2016.

TABLE B
TOTAL VALUATION PERMIT FEE
$1.00 to $500.00 $30.00
$501 to $2,000 $30.00 for the first $500.00 plus $2.00 for each additional $100.00 or fraction thereof, to and including $2,000.
$2,001 to $25,000 $60.00 for the first $2,000 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.
$25,001 to $50,000 $267.00 for the first $25,000 plus $6.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.
$50,001 to $100,000 $429.50 for the first $50,000 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.
$100,001 to $500,000 $654.50 for the first $100,000.00 plus $3.50 for each additional $1,000.00 of fraction thereof, to and including $500,000.
$500,001 to $1,000,000 $2,054.50 for the first $500,000.00 plus $3.00 for each additional $1,000.00 or including $1,000,000
$1,000,001 AND UP $3,554.50 for the first $1,000,000.00 plus $2.00 for each additional $1,000.00 or fractions thereof.

All permits valuations shall be adjusted annually by a modifier of 5% for 2015 and 2016.

TABLE C

I. Residential Plumbing Only Permits:
Permit Type Fee Per
a.   Sewer Connection $50.00 Each
b.   Water Connection   40.00 Each
c.   Lawn Sprinkler System   55.00 Each
II. Residential Mechanical Only Permits:
Permit Type Fee Per
a.   Water Heater Replacement $40.00 Each
b.   Furnace Replacement  65.00 Each
c.  Furnace/AC Replacement  80.00 Each
d.  Gas Air Test  40.00 Each
III. Residential Electrical Only Permits:
Permit Type Fee Per
a.   Upgrade/Replace Service $50.00 Each
b.   Solar PV Systems 290 Each
c.   A/C Hook up  40.00 Each

 H. Plumbing Permit Fees:

Plumbing permit fees shall be as follows:

On a project that is exclusively limited to plumbing work and does not otherwise require a building permit, the plumbing contractor shall obtain a plumbing permit and the fees shall be based on Table C for residential work listed.  All other plumbing permit fees shall be based on contract value and calculated in accordance with the building permit fee schedule of Table B.

I. Mechanical Permit Fees:

Mechanical permit fees shall be as follows:

On a project that is exclusively limited to mechanical work and does not otherwise require a building permit, the mechanical contractor shall obtain a mechanical permit and the fees shall be based on Table C for residential work listed.  All other mechanical permit fees shall be based on contract value and calculated in accordance with the building permit fee schedule of Table B.

J. Electrical Permit Fees:

Electrical permit fees shall be as follows:

On a project that is exclusively limited to electrical work and does not otherwise require a building permit, the electrical contractor shall obtain an electrical permit and the fees shall be  shall be based on Table C for residential work listed.  All other electrical permit fees shall be based on contract value and calculated in accordance with the building permit fee schedule of Table B.

K.  Miscellaneous Fees - 1, 2, and 4 shall be adjusted for the years of 2015 and 2016 by 5%.

1. For buildings required to be inspected for regulated use licensing, including but not limited to use for cabarets, hotels, motels, foster care, nursing homes or similar buildings, an inspection fee of $100.00 shall be paid.

2. Inspections conducted outside of normal office hours at the request of a permittee shall require payment of additional inspection fees of $ 75.00 per hour for inspectors’ time reasonably required in inspection for the work and travel to and from the site of the work, with a minimum fee based upon 2 hours per inspector.                  

3. Reinspection fee shall be $100.00.

4. There shall be no additional fee for issuance of the final Certificate of Occupancy. Partial, temporary or preliminary occupancy certificates shall be charged an additional fee as follows:

                       Residential Properties -- $10.00 per living unit up to 4 units

                       All other structures -- $25.00 per certificate.

5.  Elevator  inspection fees shall be $175.00.

L. Appeal fee shall be $100.00 per appeal.

M. Building Codes Applicable to City Buildings

Table B and Table C along with Miscellaneous Fees numbers 1, 2, and 4 shall be adjusted for the years of 2015 and 2016 by 5% unless the City Council and County Commissioners find that such increases are not required based on economic factors.

All codes referred to herein shall be applicable to buildings owned or occupied by the City of Pueblo, its departments, divisions and agencies. The City shall comply with the provisions of such codes including obtaining permits for all work performed and payment of permit fees.

Section 2.

Any prior resolution relating to fees charged by the Pueblo Regional Building Department is hereby rescinded and superseded by this Resolution.

Section 3.

This resolution shall become effective on November 1, 2013. (Res. 13-196, Res. 15-154)